2018 Consolidated Production, Investments and Cost Guidance

MineSilver
(Moz)
Gold
(koz)
Lead
(Mlbs)
Zinc
(Mlbs)
Investments
(US$ M)
Cash Cost
(US$/t)
AISC1
(US$/ oz Ag)
San Jose Mine, Mexico7.548.3N/AN/A16.961.26.6
Caylloma Mine, Peru0.8--25.844.821.381.3(5.2)
Total8.148.325.844.838.2  
  • 2018 silver equivalent2 production guidance of 11.4 million ounces
  • 2018 consolidated AISC of  US$6.8/oz Ag

Notes:

  1. All-in sustaining cash cost (AISC) per ounce of silver is net of by-products gold, lead and zinc
  2. Silver equivalent production does not include lead nor zinc and is calculated using a silver to gold ratio of 65 to 1 
  3. Total figures may not add due to rounding

2018 Cash Cost Guidance Breakdown

 Caylloma Mine, Peru
(US$/t)
San Jose Mine, Mexico
(US$/t)
Mine41.631.3
Plant14.117.2
Indirect cost18.97.1
Community relations0.61.1
Distribution cost6.24.5
Total81.361.2

Note:

  1. Total figures may not add up due to rounding