25
SAN JOSE MINE, MEXICO
DRIVING GROWTH FROM WITHIN
2015 Production and Cost Guidance
Tonnes milled
700,000
Metal production
Silver (Moz)
4.6
Gold (koz)
33.3
Head grade
Silver (g/t)
214
Gold (g/t)
1.66
Unit costs
Cash cost ($/t)
$62.7
AISCC ($/oz Ag)
$16.27
2013
2012
2011
0.5
1.9
2.5
4.4 4.6
5.5
6.7
52.3
41.8
33.3
33.5
19.0
17.9
4.5
2014
2015E 2016E 2017E
2
2013
2012
2011
2014
2015E 2016E 2017E
Silver and Gold Production Guidance
Silver (Moz)
Gold (koz)